Request BIM Consultation
Commercial & Mixed-Use BIM Modeling

WeWork Co-Working Workspaces

Global Multi-Sites

Project Overview

The WeWork Office Spaces project involved developing accurate BIM models for flexible office environments across multiple locations. The facilities comprised private offices, open workspaces, collaborative areas, and supporting MEP services. The objective was to convert existing as-built CAD drawings into coordinated BIM models to support facility documentation, space planning, and future modifications.

OneClick BIM developed Stage 300 BIM models that provided project stakeholders with a reliable digital representation of the office spaces while improving coordination and documentation accuracy.

OneClick BIM's Scope

OneClick BIM was responsible for creating coordinated BIM models from existing as-built CAD drawings and generating updated project documentation.

The project scope included:

  • Stage 300 BIM Modelling

  • Architectural Modelling

  • Interior Modelling

  • MEP Modelling

  • As-Built CAD to BIM Conversion

  • As-Built Drawing Generation

  • Multidisciplinary Model Coordination

The coordinated BIM model served as a dependable digital reference for facility planning and future workspace modifications.

Key Challenge

Converting legacy CAD documentation into an accurate BIM environment required maintaining consistency across architectural layouts, interior spaces, and MEP systems. The challenge was to create a coordinated digital model that accurately reflected existing conditions while supporting efficient space planning and future refurbishment activities.

OneClick BIM's Workflow

Existing Documentation Review

Available as-built CAD drawings were reviewed to establish modelling requirements and validate existing building information.

BIM Model Development

A coordinated Stage 300 BIM model was developed by integrating architectural, interior, and MEP disciplines into a unified digital environment.

Coordination Review

The multidisciplinary model underwent quality checks to verify model accuracy and coordination across all building systems.

Drawing Production

Updated as-built drawings were generated directly from the BIM model to support documentation and future facility management.

Final BIM Delivery

OneClick BIM delivered coordinated Stage 300 BIM models together with updated as-built drawings for WeWork office spaces. The deliverables provided an accurate digital record of the facilities, supporting workspace planning, future modifications, and improved multidisciplinary coordination.

Key Project Highlights

  • Accurate Stage 300 BIM Model
  • CAD to BIM Conversion
  • Coordinated Architectural, Interior & MEP Information
  • Updated As-Built Drawings
  • Improved Space Planning
  • Better Design Coordination

Working on flexible co-working office spaces, multi-site interior fit-outs, or corporate workplace developments?

Our team can be set up and working within 48 hours of project kickoff to support BIM coordination, clash detection, MEP coordination, and construction-ready model documentation.

Start Your Project →
ISO 19650 Certified  |  1100+ Global Projects  |  Across 3 Continents