Paige Elementary School

New York, USA

Project Overview

Paige Elementary School is part of a district-wide educational infrastructure program in New York, comprising school facilities ranging from 60,000 sq. ft. to 280,000 sq. ft. The project required an accurate BIM model of the existing building to support future planning, renovations, and facility management through reliable digital documentation.

OneClick BIM developed a coordinated LOD 300 BIM model from point cloud data, providing project stakeholders with a dependable digital representation of the school while improving documentation accuracy and multidisciplinary coordination.

OneClick BIM's Scope

OneClick BIM was responsible for converting point cloud data into a coordinated BIM model of the existing school facility.

The project scope included:

  • LOD 300 BIM Modelling

  • Point Cloud to BIM Conversion

  • Architectural Modelling

  • Structural Modelling

  • Existing Conditions Documentation

  • Immediate Site Plan Development

  • Coordinated BIM Model Development

The coordinated model served as a reliable digital reference for future planning and redevelopment activities.

Key Challenge

Creating an accurate BIM model from point cloud data required precise representation of the existing building geometry while maintaining coordination between architectural and structural elements. The model needed to deliver reliable documentation that could support future renovations, design development, and long-term facility management.

OneClick BIM's Workflow

Point Cloud Assessment

Point cloud data was reviewed to establish modelling requirements and accurately capture existing building conditions.

BIM Model Development

A coordinated LOD 300 BIM model was developed by integrating architectural and structural disciplines together with the immediate site plan.

Coordination Review

The multidisciplinary model underwent quality assurance and coordination checks to verify geometric accuracy and consistency across all disciplines.

Model Validation

The completed BIM model was validated to ensure reliable documentation for planning, renovation, and future operational requirements.

Final BIM Delivery

OneClick BIM delivered a coordinated LOD 300 BIM model with an immediate site plan developed from point cloud data. The deliverables provided accurate existing-condition documentation, supporting design coordination, facility planning, and long-term asset management.

Key Project Highlights

  • LOD 300 BIM Model
  • Point Cloud to BIM Conversion
  • Architectural & Structural Modelling
  • Existing Conditions Documentation
  • Immediate Site Plan Development
  • Improved Design Coordination

PROJECT DETAILS & WORKFLOW

Frequently Asked Questions

What is BIM for elementary schools? +

BIM gives the school a coordinated 3D model that captures existing conditions for future planning. For Paige Elementary School, OneClick BIM developed a coordinated LOD 300 model from point cloud data to support future planning, renovations and facility management.

What is point cloud to BIM? +

Point cloud to BIM converts laser scan data of an existing building into an accurate 3D model. On this project, point cloud data was reviewed to establish modelling requirements and accurately capture the school's existing building conditions.

What is architectural modelling in BIM? +

It means building the school's walls, floors, roofs and rooms into the coordinated 3D model. Architectural modelling was part of this scope, integrated with the structural discipline in one LOD 300 model.

What is structural modelling in BIM? +

It means building the load-bearing elements into the 3D model so they coordinate with the architecture. Structural modelling was part of this scope, coordinated with the architectural model for documentation accuracy.

What is existing conditions documentation? +

It is the process of recording the building's current state so renovation plans start from reality. This school was documented from point cloud data, giving stakeholders a dependable digital representation of the existing building.

What is an immediate site plan in BIM? +

It is a plan of the school's site and surroundings developed from the same point cloud data. An immediate site plan was delivered with this model to support campus planning alongside the building documentation.

What deliverables come from a school BIM project? +

The coordinated LOD 300 model plus accurate existing-condition documentation. For Paige Elementary School, the deliverables supported design coordination, facility planning and long-term asset management.

Working on an elementary school modernization, educational campus retrofit, or institutional building?

Our team can be set up and working within 48 hours of project kickoff to support BIM coordination, clash detection, MEP coordination, and construction-ready model documentation.

Start Your Project →