Request BIM Consultation
Education BIM Modeling

Paige Elementary School

New York, USA

Project Overview

Paige Elementary School is part of a district-wide educational infrastructure program in New York, comprising school facilities ranging from 60,000 sq. ft. to 280,000 sq. ft. The project required an accurate BIM model of the existing building to support future planning, renovations, and facility management through reliable digital documentation.

OneClick BIM developed a coordinated LOD 300 BIM model from point cloud data, providing project stakeholders with a dependable digital representation of the school while improving documentation accuracy and multidisciplinary coordination.

OneClick BIM's Scope

OneClick BIM was responsible for converting point cloud data into a coordinated BIM model of the existing school facility.

The project scope included:

  • LOD 300 BIM Modelling

  • Point Cloud to BIM Conversion

  • Architectural Modelling

  • Structural Modelling

  • Existing Conditions Documentation

  • Immediate Site Plan Development

  • Coordinated BIM Model Development

The coordinated model served as a reliable digital reference for future planning and redevelopment activities.

Key Challenge

Creating an accurate BIM model from point cloud data required precise representation of the existing building geometry while maintaining coordination between architectural and structural elements. The model needed to deliver reliable documentation that could support future renovations, design development, and long-term facility management.

OneClick BIM's Workflow

Point Cloud Assessment

Point cloud data was reviewed to establish modelling requirements and accurately capture existing building conditions.

BIM Model Development

A coordinated LOD 300 BIM model was developed by integrating architectural and structural disciplines together with the immediate site plan.

Coordination Review

The multidisciplinary model underwent quality assurance and coordination checks to verify geometric accuracy and consistency across all disciplines.

Model Validation

The completed BIM model was validated to ensure reliable documentation for planning, renovation, and future operational requirements.

Final BIM Delivery

OneClick BIM delivered a coordinated LOD 300 BIM model with an immediate site plan developed from point cloud data. The deliverables provided accurate existing-condition documentation, supporting design coordination, facility planning, and long-term asset management.

Key Project Highlights

  • LOD 300 BIM Model
  • Point Cloud to BIM Conversion
  • Architectural & Structural Modelling
  • Existing Conditions Documentation
  • Immediate Site Plan Development
  • Improved Design Coordination

Working on an elementary school modernization, educational campus retrofit, or institutional building?

Our team can be set up and working within 48 hours of project kickoff to support BIM coordination, clash detection, MEP coordination, and construction-ready model documentation.

Start Your Project →
ISO 19650 Certified  |  1100+ Global Projects  |  Across 3 Continents