Request BIM Consultation
Energy & Oil & Gas MEP & MEPF BIM

Oil Plant Facility

Saudi Arabia

Project Overview

The Oil Plant project involved developing an accurate BIM model of an existing industrial oil processing facility in Saudi Arabia using point cloud data. The objective was to create a coordinated digital representation of the plant's equipment and MEP services to support future maintenance, engineering coordination, and facility management.

OneClick BIM developed an LOD 300 BIM model that enabled project stakeholders to access reliable existing-condition information while improving documentation accuracy and multidisciplinary coordination across the industrial facility.

OneClick BIM's Scope

OneClick BIM was responsible for converting point cloud data into a coordinated BIM model of the existing oil plant.

The project scope included:

  • LOD 300 BIM Modelling

  • Point Cloud to BIM Conversion

  • Equipment Modelling

  • MEP Services Modelling

  • Existing Conditions Documentation

  • Coordinated BIM Model Development

The coordinated model served as a reliable digital reference for engineering and operational activities.

Key Challenge

Industrial oil processing facilities contain densely packed equipment and interconnected MEP systems that require highly accurate digital documentation. The challenge was to develop a coordinated BIM model from point cloud data while maintaining accuracy across equipment layouts and building services to support future maintenance and engineering projects.

OneClick BIM's Workflow

Point Cloud Assessment

Point cloud data was reviewed to identify existing equipment, MEP services, and modelling requirements.

BIM Model Development

A coordinated LOD 300 BIM model was developed by integrating equipment and MEP services into a unified digital environment.

Coordination Review

The model underwent quality assurance and coordination reviews to verify accuracy, system alignment, and consistency with the captured site conditions.

Model Validation

The completed BIM model was validated to ensure it provided reliable documentation for future engineering and operational requirements.

Final BIM Delivery

OneClick BIM delivered a coordinated LOD 300 BIM model developed from point cloud data, providing an accurate digital representation of the facility's equipment and MEP services. The deliverables supported engineering coordination, maintenance planning, and long-term asset management.

Key Project Highlights

  • LOD 300 BIM Model
  • Point Cloud to BIM Conversion
  • Equipment & MEP Services Modelling
  • Existing Conditions Documentation
  • Improved Engineering Coordination
  • Enhanced Facility Management

PROJECT DETAILS & WORKFLOW

Frequently Asked Questions

What is BIM for oil processing plants? +

Oil processing plants have densely packed equipment and interconnected MEP systems. For this facility in Saudi Arabia, OneClick BIM developed a coordinated LOD 300 model from point cloud data to support maintenance, engineering coordination and facility management.

What is point cloud to BIM? +

Point cloud to BIM converts laser scan data of an existing facility into an accurate 3D model. On this project, point cloud data was reviewed to identify existing equipment and MEP services, then converted into a coordinated LOD 300 model.

What is equipment modeling in BIM? +

Equipment modeling builds the plant's machinery and process equipment into the 3D model. Equipment modelling was part of this scope, integrated with MEP services in one unified digital environment.

What is MEP services modeling? +

MEP services modeling represents the mechanical, electrical and plumbing systems in 3D. On this oil plant, MEP services were modeled together with equipment so every system stayed coordinated.

What is existing conditions documentation? +

It is the process of recording a facility's current state in the BIM model so teams plan from reality. This oil plant was documented from point cloud data to give stakeholders reliable existing-condition information.

What is model validation in BIM? +

Model validation checks that the BIM model provides reliable documentation. The completed oil plant model was validated to ensure dependable documentation for future engineering and operational requirements.

What deliverables come from an industrial plant BIM project? +

The coordinated LOD 300 BIM model plus accurate documentation of the facility's equipment and MEP services. For this oil plant, the deliverables supported engineering coordination, maintenance planning and long-term asset management.

Working on an industrial oil processing plant, refinery facility, or heavy piping process building?

Our team can be set up and working within 48 hours of project kickoff to support BIM coordination, clash detection, MEP coordination, and construction-ready model documentation.

Start Your Project →
ISO 19650 Certified  |  1100+ Global Projects  |  Across 3 Continents