Request BIM Consultation
Hospitality & Leisure Scan to BIM

Manchester Marriott Piccadilly

Manchester, UK

Project Overview

The Manchester Marriott Hotel Piccadilly is a 9-storey four-star hospitality facility in Manchester, UK, with a distinctive building envelope that forms an important part of the property's architectural identity.

OneClick BIM was engaged to develop an LOD 300 BIM model of the hotel's façade, covering both architectural and structural elements.

The objective was to create a coordinated digital representation of the building envelope, providing project stakeholders with a reliable reference for visualization, design coordination, documentation, and future planning activities.

OneClick BIM's Scope

OneClick BIM was responsible for developing the hotel's façade BIM model across architectural and structural disciplines.

The project scope included:

  • LOD 300 BIM Modelling

  • Façade BIM Modelling

  • Architectural BIM Modelling

  • Structural BIM Modelling

  • Building Envelope Modelling

  • Façade & Structural Coordination

  • Digital Façade Documentation

  • BIM-Based Visualization

  • Design Coordination Support

The model was developed to accurately represent the façade geometry and its relationship with the supporting structural elements.

Key Challenge

The primary challenge was accurately representing the building's façade while maintaining coordination between the architectural envelope and supporting structural elements.

For a large hospitality building, the façade contains numerous geometric relationships that need to remain consistent within the BIM environment. Maintaining accurate façade geometry and alignment with the structural framework was therefore essential for reliable documentation and future project reference.

OneClick BIM addressed this through a structured LOD 300 modelling workflow focused on façade geometry, architectural representation, and structural integration.

OneClick BIM's Workflow

Project Information Review

Available architectural information, façade references and structural documentation were reviewed to establish the modelling requirements.

Façade BIM Development

The building envelope and relevant architectural façade elements were developed into an LOD 300 BIM model.

Structural Integration

Supporting structural elements were modelled and coordinated with the façade to maintain alignment between the building envelope and structural framework.

Coordination Review

The model was reviewed to verify façade geometry, alignment and coordination between architectural and structural elements.

Model Refinement

The coordinated model was refined to provide a consistent digital representation of the hotel's exterior and supporting systems.

Final BIM Delivery

OneClick BIM delivered a coordinated LOD 300 façade BIM model covering the architectural and structural disciplines of Manchester Marriott Hotel Piccadilly.

The final model provided a digital representation of the hotel's building envelope and its relationship with the supporting structural elements, creating a reliable reference for visualization, coordination, documentation and future planning.

Key Project Highlights

  • LOD 300 façade BIM model
  • Accurate building envelope representation
  • Coordinated architectural and structural information
  • Improved façade visualization
  • Better understanding of façade and structural relationships
  • Consistent digital façade documentation
  • BIM-based design coordination
  • Reliable digital reference for future planning and refurbishment

PROJECT DETAILS & WORKFLOW

Frequently Asked Questions

What is scan-to-BIM? +

Scan-to-BIM converts laser scan data of an existing building into an accurate 3D model. For Manchester Marriott Piccadilly, OneClick BIM developed an LOD 300 BIM model of the 9-storey hotel's facade, covering both architectural and structural elements.

How does point cloud to BIM work? +

A point cloud captures millions of measured points from the existing building, which are then modelled into coordinated BIM geometry. On this project, available architectural information, facade references and structural documentation were reviewed to establish modelling requirements before the building envelope was developed into an LOD 300 BIM model.

What is a deviation report? +

A deviation report compares the BIM model against the point cloud or site measurements to show where the model differs from the captured reality. It verifies that the model is a reliable representation before it is used for design and planning.

Why use scan-to-BIM for a hotel renovation? +

Renovations start from the existing building, so accurate documentation is essential. The coordinated facade model gave stakeholders a reliable reference for visualization, design coordination, documentation and future planning activities for the renovation.

What is facade BIM modeling? +

Facade BIM modeling builds the building envelope in 3D, including its relationship with the supporting structure. For this hotel, the facade geometry was accurately represented and coordinated with structural elements to keep every geometric relationship consistent.

What LOD is needed for a renovation project? +

LOD 300 is a common choice because it provides accurate geometry for coordination and planning without the cost of fabrication-level detail. This hotel's facade was delivered as a coordinated LOD 300 model, which supported visualization, design coordination and future refurbishment planning.

What files do you get from a scan-to-BIM project? +

A coordinated Revit model of the surveyed scope, the point cloud data in .E57 format, and a deviation report verifying the model against the captured data. For this hotel, the deliverables included the LOD 300/350 Scan-to-BIM Revit model, the point cloud (.E57) and a deviation report.

Working on a hotel, hospitality venue, or complex architectural facade redevelopment?

Start Your Project →
ISO 19650 Certified  |  1100+ Global Projects  |  Across 3 Continents