Healthcare MEP & MEPF BIM

Kuwait New Maternity Hospital

Kuwait

Project Overview

The Kuwait New Maternity Hospital is a major healthcare development accommodating approximately 780 beds with a built-up area of 290,806 m². The project required comprehensive BIM modelling to support construction coordination, detailed documentation, and the delivery of accurate shop and as-built drawings for the structural and MEP systems.

OneClick BIM developed coordinated LOD 400 BIM models that enhanced multidisciplinary coordination, improved documentation accuracy, and supported efficient project execution throughout the construction lifecycle.

OneClick BIM's Scope

OneClick BIM was responsible for developing coordinated BIM models and producing construction-ready documentation for the healthcare facility.

The project scope included:

  • LOD 400 BIM Modelling

  • Structural Modelling

  • MEP Services Modelling

  • Shop Drawing Production

  • As-Built Drawing Development

  • Coordinated BIM Model Development

The coordinated BIM model served as a reliable digital reference throughout construction and project handover.

Key Challenge

Large healthcare facilities involve highly coordinated structural and MEP systems that must meet strict construction and operational requirements. The challenge was to maintain accurate coordination across multiple building services while producing detailed shop and as-built documentation to support construction, commissioning, and long-term facility management.

OneClick BIM's Workflow

Project Information Review

Project documentation and design information were reviewed to establish modelling standards and project deliverables.

BIM Model Development

Coordinated LOD 400 BIM models were developed for the structural framework and all MEP services.

Coordination Review

The multidisciplinary models underwent coordination and quality reviews to verify accuracy and resolve potential conflicts before documentation.

Drawing Production

Detailed shop drawings and as-built drawings were generated directly from the coordinated BIM model to support construction and final project handover.

Final BIM Delivery

OneClick BIM delivered coordinated LOD 400 BIM models together with detailed shop drawings and as-built documentation for the Kuwait New Maternity Hospital. The deliverables improved construction coordination, enhanced documentation quality, and provided an accurate digital record of the completed healthcare facility.

Key Project Highlights

  • LOD 400 BIM Model
  • Structural & MEP Modelling
  • Coordinated Shop Drawings
  • As-Built Documentation
  • Improved Construction Coordination
  • Enhanced Documentation Accuracy

PROJECT DETAILS & WORKFLOW

Frequently Asked Questions

What is BIM for hospitals? +

Hospitals need highly coordinated structural and MEP systems that meet strict construction and operational requirements. For the Kuwait New Maternity Hospital, OneClick BIM developed coordinated LOD 400 models that enhanced multidisciplinary coordination across the 780-bed facility.

What is MEP modelling for healthcare facilities? +

MEP modelling builds the mechanical, electrical and plumbing systems into the coordinated 3D model. On this hospital, MEP services were modelled to LOD 400 together with the structural framework so every building service stayed coordinated.

What is LOD 400 in BIM? +

LOD 400 adds fabrication and installation detail to the model so it can be used for construction. This hospital's structural and MEP systems were modelled to LOD 400, supporting shop drawing production and as-built documentation.

What are shop drawings in BIM? +

Shop drawings are the detailed installation drawings produced from the coordinated model. On this project, detailed shop drawings were generated directly from the coordinated BIM model to support construction.

What is as-built documentation in BIM? +

As-built documentation records what was actually built. On this hospital, as-built drawings were developed from the coordinated model, providing an accurate digital record of the completed facility.

How does BIM support hospital construction coordination? +

The multidisciplinary models are reviewed for accuracy and conflicts are resolved before documentation. On this project, coordination and quality reviews verified accuracy across all building services before the drawings were produced.

What deliverables come from a hospital BIM project? +

Coordinated LOD 400 models plus the shop and as-built drawings generated from them. For this maternity hospital, the deliverables improved construction coordination and documentation quality across the 290,806 m² facility.

Working on a hospital, specialized healthcare facility, or medical gas infrastructure project?

Our team can be set up and working within 48 hours of project kickoff to support BIM coordination, clash detection, MEP coordination, and construction-ready model documentation.

Start Your Project →