Industrial & Manufacturing BIM Modeling

Industrial Building

Saudi Arabia

Project Overview

The Industrial Building project involved developing an accurate BIM model of an existing industrial facility in Riyadh, Saudi Arabia, using point cloud data. The objective was to create a reliable digital representation of the facility's steel structural framework to support engineering coordination, refurbishment planning, and future expansion activities.

OneClick BIM developed a coordinated LOD 300 BIM model that accurately documented the existing structural system, enabling project stakeholders to improve planning, design coordination, and engineering decision-making through dependable digital documentation.

OneClick BIM's Scope

OneClick BIM was responsible for converting point cloud data into a coordinated BIM model of the existing industrial facility.

The project scope included:

  • LOD 300 BIM Modelling

  • Point Cloud to BIM Conversion

  • Steel Structure Modelling

  • Existing Conditions Documentation

  • Coordinated BIM Model Development

  • Model Validation for Engineering Planning

The coordinated model served as a reliable digital reference for future engineering and facility development.

Key Challenge

Industrial facilities require highly accurate structural documentation to support future modifications and maintenance. The challenge was to accurately interpret point cloud data and develop a coordinated BIM model that faithfully represented the existing steel framework while maintaining consistency throughout the structural model.

OneClick BIM's Workflow

Point Cloud Assessment

Point cloud data was reviewed to identify existing structural elements and establish modelling requirements.

BIM Model Development

A coordinated LOD 300 BIM model was developed by accurately modelling the facility's steel structural framework.

Coordination Review

The model underwent quality assurance and coordination checks to verify geometric accuracy and consistency with the captured site conditions.

Model Validation

The completed BIM model was validated to ensure reliable documentation for future engineering, maintenance, and expansion projects.

Final BIM Delivery

OneClick BIM delivered a coordinated LOD 300 BIM model developed from point cloud data, providing an accurate digital representation of the facility's steel structure. The deliverables supported engineering coordination, refurbishment planning, and long-term asset management.

Key Project Highlights

  • LOD 300 BIM Model
  • Point Cloud to BIM Conversion
  • Steel Structure Modelling
  • Existing Conditions Documentation
  • Improved Engineering Coordination
  • Reliable Structural Documentation

Working on a logistics warehouse, industrial plant, or pre-engineered steel structure in KSA?

Our team can be set up and working within 48 hours of project kickoff to support BIM coordination, clash detection, MEP coordination, and construction-ready model documentation.

Start Your Project →
ISO 19650 Certified  |  1100+ Global Projects  |  Across 3 Continents