Industrial & Manufacturing BIM Coordination & Clash Detection

IKO Industries Insulation Facility

Alconbury, UK

Project Overview

The IKO Industries Ltd facility in Alconbury, UK, is a large-scale insulation manufacturing facility covering approximately 272,000 sq ft (25,300 m²).

For an industrial manufacturing facility of this scale, accurate representation of structural, piping, mechanical, and plant systems is critical for technical coordination and reliable project documentation.

OneClick BIM was engaged by DMD to develop a detailed Stage 500 Plant 3D BIM model incorporating P&ID information. The resulting model provided a coordinated digital representation of the facility's core plant systems and supported model-based drawing production.

OneClick BIM's Scope

OneClick BIM was responsible for developing the Stage 500 Plant 3D BIM model and extracting coordinated drawings from the completed model.

The project scope included:

  • Stage 500 BIM Modelling

  • Plant 3D Modelling

  • P&ID Integration

  • Structural Modelling

  • Piping System Development

  • Mechanical Unit Modelling

  • Plant System Coordination

  • Coordinated Drawing Extraction

  • Model-Based Documentation

The model was developed to maintain consistency between the P&ID information, 3D plant model, and project documentation.

Key Challenge

The primary challenge was managing the technical complexity of a large industrial manufacturing facility where structural, piping, and mechanical systems needed to be accurately represented and coordinated.

The integration of detailed P&ID information also required consistency between system data, the 3D model, and the resulting drawings.

OneClick BIM addressed this through a structured Plant 3D modelling workflow, developing the facility's systems within a coordinated digital environment and maintaining clear relationships between the plant model, P&ID information, and project documentation.

OneClick BIM's Workflow

Project Information & P&ID Review

Available P&ID information, system inputs and discipline-specific references were reviewed to establish the modelling requirements and project structure.

Plant 3D Model Development

The facility's structural elements, piping networks, mechanical units and related plant systems were developed within Plant 3D.

System Coordination

Model elements were coordinated to maintain consistency between the P&ID information, plant systems and 3D representation.

Model Quality Review

The developed model was reviewed for consistency, system relationships and documentation requirements.

Drawing Extraction

Coordinated drawings were extracted directly from the BIM model, providing the project team with model-based technical documentation.

Final BIM Delivery

OneClick BIM delivered a detailed Stage 500 Plant 3D BIM model for the IKO Industries manufacturing facility, incorporating P&ID information alongside structural, piping, mechanical and plant system modelling.

Coordinated drawings were extracted directly from the completed model, providing the project team with a consistent set of model-based documentation for review, coordination and planning.

Key Project Highlights

  • Detailed Stage 500 Plant 3D BIM model
  • P&ID-integrated plant modelling
  • Coordinated structural, piping and mechanical information
  • Detailed representation of plant systems
  • Model-based drawing extraction
  • Improved consistency between model and documentation
  • Structured digital reference for the facility
  • Better coordination and technical review

Working on an industrial manufacturing plant, PIR insulation facility, or heavy process building?

Our team can be set up and working within 48 hours of project kickoff to support BIM coordination, clash detection, MEP coordination, and construction-ready model documentation.