Electrical Substation Infrastructure

United Kingdom

Project Overview

The Substation project involved developing an accurate BIM model of an existing electrical substation in the United Kingdom using point cloud data. The objective was to create a coordinated digital representation of the facility's electrical equipment and MEP services to support engineering coordination, maintenance planning, and future infrastructure upgrades.

OneClick BIM developed a coordinated LOD 300 BIM model that provided project stakeholders with reliable existing-condition documentation, enabling improved asset visibility and informed decision-making throughout the facility lifecycle.

OneClick BIM's Scope

OneClick BIM was responsible for converting point cloud data into a coordinated BIM model of the existing substation.

The project scope included:

  • LOD 300 BIM Modelling

  • Point Cloud to BIM Conversion

  • Electrical Equipment Modelling

  • MEP Services Modelling

  • Existing Conditions Documentation

  • Coordinated BIM Model Development

The coordinated model served as a reliable digital reference for engineering and operational activities.

Key Challenge

Electrical substations comprise densely arranged equipment and interconnected building services that demand precise digital documentation. The challenge was to accurately convert point cloud data into a coordinated BIM model while maintaining consistency across electrical equipment and MEP systems, ensuring the model could support future maintenance, engineering modifications, and operational planning.

OneClick BIM's Workflow

Point Cloud Assessment

Point cloud data was reviewed to identify existing equipment, MEP services, and project modelling requirements.

BIM Model Development

A coordinated LOD 300 BIM model was developed by integrating electrical equipment and MEP services into a unified digital environment.

Coordination Review

The model underwent quality assurance and coordination reviews to verify geometric accuracy and consistency across all building systems.

Model Validation

The completed BIM model was validated to ensure reliable documentation for future engineering, maintenance, and asset management activities.

Final BIM Delivery

OneClick BIM delivered a coordinated LOD 300 BIM model developed from point cloud data, providing an accurate digital representation of the substation's equipment and building services. The deliverables supported engineering coordination, maintenance planning, and long-term infrastructure management.

Key Project Highlights

  • LOD 300 BIM Model
  • Point Cloud to BIM Conversion
  • Electrical Equipment & MEP Modelling
  • Existing Conditions Documentation
  • Improved Engineering Coordination
  • Enhanced Asset Management

Working on an electrical substation, high-voltage utility hub, or energy grid infrastructure project?

Our team can be set up and working within 48 hours of project kickoff to support BIM coordination, clash detection, MEP coordination, and construction-ready model documentation.

Start Your Project →
ISO 19650 Certified  |  1100+ Global Projects  |  Across 3 Continents