Data Center

London, UK

Project Overview

The London Data Center project involved construction-stage BIM coordination for a multi-level, mission-critical facility with highly congested building services. The project included complex MEP systems, electrical infrastructure, cooling networks, fire protection systems, and specialist data center services that required accurate coordination before site installation.

For a mission-critical facility where service routing, installation accuracy, accessibility, and operational reliability are essential, a coordinated BIM model provided the project team with a reliable environment to identify and resolve coordination issues before construction.

OneClick BIM supported the project team by coordinating multiple building services within a shared BIM environment, helping improve constructability, installation planning, and multidisciplinary coordination.

OneClick BIM's Scope

OneClick BIM was responsible for supporting construction-stage BIM coordination across the project's interconnected building services.

The project scope included:

  • Construction-stage BIM Coordination

  • MEP Coordination

  • Electrical System Coordination

  • Cooling System Coordination

  • Fire Protection Coordination

  • Specialist Systems Integration

  • Clash Detection & Resolution

  • Constructability Review

  • Construction Coordination Documentation

The coordinated model served as a common digital reference for reviewing system interfaces, service routing, spatial requirements, and potential installation conflicts.

Key Challenge

The primary challenge was managing the high level of service congestion within the mission-critical data center environment.

Multiple systems had to be coordinated within restricted ceiling voids, risers, plant spaces, and service corridors while maintaining appropriate spatial clearances and access for installation and maintenance.

Coordination between MEP, electrical, cooling, fire protection, and specialist systems was therefore critical to identifying conflicts before they reached the construction site.

OneClick BIM addressed these challenges through a multidisciplinary BIM coordination workflow focused on clash identification, system interfaces, spatial clearances, and constructability.

OneClick BIM's Workflow

Model & Project Input Review

Available discipline models and project information were reviewed to understand the coordination requirements and establish the project coordination environment.

Multidisciplinary BIM Coordination

MEP, electrical, cooling, fire protection, and specialist systems were brought together within a coordinated BIM environment.

Clash Detection & Review

The integrated model was reviewed to identify clashes, service intersections, spatial conflicts, and potential installation issues.

Coordination & Resolution

Identified coordination issues were reviewed and resolved with consideration for service routing, accessibility, constructability, and site installation requirements.

Construction Coordination

The coordinated information was communicated to support design decisions, procurement coordination, and construction planning.

Final BIM Delivery

OneClick BIM delivered a coordinated BIM model supported by clash resolution and construction coordination documentation for the London data center project.

The final BIM deliverables provided the project team with improved visibility of interconnected building services and helped establish a clearer digital reference for construction-stage coordination and installation planning.

Key Project Highlights

  • Coordinated construction-stage BIM model
  • Improved MEP and electrical coordination
  • Early identification of critical clashes
  • Better cooling and fire protection system coordination
  • Improved service routing and spatial planning
  • Enhanced constructability review
  • Reduced potential installation conflicts
  • Better coordination between design and site teams
  • Improved construction planning and decision-making

PROJECT DETAILS & WORKFLOW

Frequently Asked Questions

What is LOD 400 in BIM? +

LOD 400 means BIM model elements are detailed enough to fabricate and install from, with exact geometry, connections and assembly information. On this project, OneClick BIM delivered an LOD 400 Revit model plus fabrication spool sheets.

Which MEP systems were coordinated in this data center project? +

Mechanical, electrical and plumbing systems, along with cooling networks, fire protection and specialist data center services. All of them were coordinated in one shared BIM model so conflicts were resolved before installation.

How were clashes handled on this project? +

The coordinated model was reviewed in Navisworks to find clashes early. Each clash was resolved and documented in clash audit reports, with construction coordination documentation issued for the site teams.

What did OneClick BIM deliver for this data center? +

An LOD 400 Revit model, fabrication spool sheets, clash audit reports and a Navisworks NWD file. Together they form a coordinated, construction-ready BIM package for the 45,000 m² mission-critical facility.

Why is BIM coordination critical for data centers? +

Data centers pack dense services into tight ceiling voids, risers and plant rooms, where keeping clearances and access is hard. Coordinating it all digitally first stops installation conflicts that are expensive to fix on site, especially in a mission-critical facility.

What is the difference between design-stage and construction-stage BIM coordination? +

Design-stage coordination resolves clashes between design disciplines. Construction-stage coordination, which was used on this project, goes further and produces fabrication-ready models, spool sheets and installation documentation that site teams use to build without rework.

How quickly can OneClick BIM start on a data center project? +

The team can be set up and working within 48 hours of kickoff, covering BIM coordination, clash detection, MEP coordination and construction-ready model documentation.

Working on a data center, mission-critical facility, or service-heavy building project?

Our team can be set up and working within 48 hours of project kickoff to support BIM coordination, clash detection, MEP coordination, and construction-ready model documentation.

Start Your Project →
ISO 19650 Certified  |  1100+ Global Projects  |  Across 3 Continents