Request BIM Consultation
Commercial & Mixed-Use BIM Modeling

Creek Crescent Tower

UAE

Project Overview

Creek Crescent Tower is a landmark residential development in Downtown Dubai comprising two residential towers of 39 and 21 storeys, offering 307 apartments along with retail spaces, a business centre, swimming pools, fitness facilities, and recreational amenities. The project required a coordinated BIM approach to support design development, construction coordination, and project delivery across multiple disciplines.

OneClick BIM delivered comprehensive BIM services from design coordination through construction support, helping project stakeholders improve collaboration, reduce coordination issues, and streamline project execution.

OneClick BIM's Scope

OneClick BIM was responsible for delivering multidisciplinary BIM services throughout the project lifecycle.

The project scope included:

  • BIM Execution Plan (BEP) Development

  • Stage 300-500 BIM Modelling

  • Architectural, Structural, Interior, MEP & Landscape Modelling

  • Clash Detection & Coordination

  • Shop Drawing Production

  • 4D Construction Sequencing

  • As-Built Model Updates

The coordinated BIM environment served as the central source of project information throughout design and construction.

Key Challenge

The scale and complexity of a high-rise mixed-use development required seamless coordination across multiple disciplines while maintaining model accuracy throughout the project lifecycle. Efficient clash detection, coordinated documentation, and construction sequencing were essential to minimise rework and support timely project delivery.

OneClick BIM's Workflow

BIM Planning

A BIM Execution Plan was developed to establish project standards, workflows, and coordination procedures.

Model Development

Stage 300-500 BIM models were created across architectural, structural, interior, MEP, and landscape disciplines.

Coordination Review

Clash detection and multidisciplinary coordination were carried out to identify and resolve design conflicts before construction.

Construction Support

Shop drawings, 4D sequencing, and as-built model updates were produced to support construction and project closeout.

Final BIM Delivery

OneClick BIM delivered coordinated Stage 300-500 BIM models, shop drawings, construction sequencing, and as-built updates for Creek Crescent Tower. The deliverables enhanced project coordination, improved construction efficiency, and provided an accurate digital record of the completed development.

Key Project Highlights

  • Stage 300-500 BIM Models
  • BIM Execution Plan Development
  • Multidisciplinary Coordination
  • Clash Detection & Resolution
  • Shop Drawing Production
  • 4D Construction Sequencing

Working on a landmark high-rise residential tower or multi-building urban development?

Our team can be set up and working within 48 hours of project kickoff to support BIM coordination, clash detection, MEP coordination, and construction-ready model documentation.

Start Your Project →
ISO 19650 Certified  |  1100+ Global Projects  |  Across 3 Continents