Request BIM Consultation
Commercial & Mixed-Use BIM Modeling

Aire Street Redevelopment

Leeds, UK

Project Overview

The Aire Street Redevelopment project involved creating an accurate BIM model of an existing commercial property in Leeds, UK, to support refurbishment and interior redesign. The development comprises private offices, coworking spaces, collaborative lounges, and rooftop amenities, requiring reliable documentation of the building's existing architectural, structural, and MEP systems.

OneClick BIM developed a coordinated Stage 300 BIM model to provide project stakeholders with a dependable digital representation of the facility, enabling accurate renovation planning, multidisciplinary coordination, and improved project documentation.

OneClick BIM's Scope

OneClick BIM was responsible for developing a coordinated BIM model and generating detailed as-built documentation from the existing building.

The project scope included:

  • Stage 300 BIM Modelling

  • Architectural, Structural & MEP Modelling

  • Existing Conditions Documentation

  • As-Built Drawing Extraction

  • Model Validation for Renovation Planning

The coordinated model served as a reliable digital reference for the design and refurbishment team.

Key Challenge

The primary challenge was accurately documenting the existing building while maintaining coordination between architectural layouts, structural elements, and MEP services. Reliable existing-condition information was essential to minimise design conflicts and support efficient renovation planning.

OneClick BIM's Workflow

Existing Building Assessment

Available project documentation and existing information were reviewed to establish modelling requirements.

BIM Model Development

A coordinated Stage 300 BIM model was developed by integrating architectural, structural, and MEP disciplines.

Coordination Review

The multidisciplinary model underwent quality checks to verify model accuracy and consistency across all building systems.

Drawing Production

Detailed as-built drawings were extracted directly from the BIM model to support the refurbishment project.

Final BIM Delivery

OneClick BIM delivered a coordinated Stage 300 BIM model together with detailed as-built drawings for the Aire Street redevelopment. The deliverables provided architects and consultants with reliable building information, supporting renovation planning, design coordination, and accurate project documentation.

Final BIM Delivery

The completed BIM model established a dependable digital foundation for the redevelopment project, improving documentation quality, multidisciplinary coordination, and confidence in renovation planning.

Key Project Highlights

  • Accurate Stage 300 BIM Model
  • Reliable Existing Conditions Documentation
  • Coordinated Architectural, Structural & MEP Information
  • Detailed As-Built Drawings
  • Improved Renovation Planning
  • Better Design Coordination

Working on a commercial office redevelopment, co-working space, or interior refurbishment project?

Our team can be set up and working within 48 hours of project kickoff to support BIM coordination, clash detection, MEP coordination, and construction-ready model documentation.

Start Your Project →
ISO 19650 Certified  |  1100+ Global Projects  |  Across 3 Continents